- Filename
- local_authority_planned_places_201920.csv
- Geographic levels
- Local authority
- Time period
- 2021/22 to 2023/24
- Content
Mainstream places reported by the local authorities that responded to the survey, as planned to be added to their school capacity. Includes only projects with firm plans for delivery which rely on ongoing building work.
Variable names and descriptions for Local authority planned places
Variable names and descriptions for this file are provided below:
| Variable name | Variable description |
|---|---|
| places_to_deliver | Additional school places planned for delivery (permanent and temporary) |
| planning_area_phase | Planning area phase - Filter by phase. |
Footnotes for Local authority planned places
- Includes places in mainstream schools reported by local authorities in September 2020 as planned to be added by 2021/22, including some planned places for 2022/23 and 2023/24. Academic year is based on places being added by the September of each respective year, based on target completion date provided by the local authorities. Includes only projects with ongoing building work.
- Data on permanent and temporary places was collected through the voluntary September sufficiency survey in 2020.
- Excludes additional places in projects funded through central DfE programmes, such as Free Schools, unless local authorities have contributed their own funding to deliver additional places to these projects.
- Excludes nursery places.
- Data may include places for Year 12 to Year 14.