Data set from Children in need

C4 Section 47s and Initial Child Protection Conferences by local authority

Not the latest data
Published
Last updated

 Section 47 enquiries and initial child protection conferences.


Data set details

Theme
Children's social care
Publication
Children in need
Release type
Geographic levels
Local authority, National, Regional
Indicators
  • Duration between start of Section 47 enquiry and ICPC (0-10 working days)
  • Duration between start of Section 47 enquiry and ICPC (11-15 working days)
  • Duration between start of Section 47 enquiry and ICPC (16-20 working days)
Time period
2013 to 2022

Data set preview

Table showing first 5 rows, from underlying data
time_periodtime_identifiergeographic_levelcountry_codecountry_nameregion_coderegion_nameold_la_codenew_la_codela_namecategorySection47Section47_rateSection47_childSection47_child_rateICPCICPC_rateICPC_childICPC_child_rateDuration_0-10_daysDuration_11-15_daysDuration_16-20_daysDuration_21+_daysDuration_25th_PercentileDuration_medianDuration_75th_Percentile
2022Reporting yearNationalE92000001EnglandSection 47s and Initial Child Protection Conferences217800180.1189430156.673790617280060.270405140070608280131415
2022Reporting yearRegionalE92000001EnglandE12000001North EastSection 47s and Initial Child Protection Conferences14260267.212470233.7517097512095.92404140440360131415
2022Reporting yearRegionalE92000001EnglandE12000002North WestSection 47s and Initial Child Protection Conferences2970018925170160.11042066.31026065.31040719010801120121415
2022Reporting yearRegionalE92000001EnglandE12000003Yorkshire and The HumberSection 47s and Initial Child Protection Conferences24000204.420790177836071.2828070.5690531010901280131417
2022Reporting yearRegionalE92000001EnglandE12000004East MidlandsSection 47s and Initial Child Protection Conferences15850157.313700136625062618061.35904670460530121414

Variables in this data set

Table showing first 5 of 15 variables
Variable nameVariable description
Duration_0-10_daysDuration between start of Section 47 enquiry and ICPC (0-10 working days)
Duration_11-15_daysDuration between start of Section 47 enquiry and ICPC (11-15 working days)
Duration_16-20_daysDuration between start of Section 47 enquiry and ICPC (16-20 working days)
Duration_21+_daysDuration between start of Section 47 enquiry and ICPC (21+ working days)
Duration_25th_PercentileDuration between start of Section 47 enquiry and ICPC (25th percentile working days)

Footnotes

  1. Rates per 10,000 children are calculated based on ONS mid-year population estimates for children aged 0 to 17 years.
  2. Data for the years ending 31 March 2021 and 2022 is not available for Hackney local authority, therefore 2020 data for Hackney has been included in 2021 and 2022 national totals, and regional totals for inner London and London. Refer to the methodology section for more information.
  3. The duration between start of a section 47 enquiry and initial child protection conference is calculated as the time in working days between the start of section 47 and the date of the initial child protection conference. For cases transferred in from another local authority, the duration is calculated as time in working days between the referral date and the date of the initial child protection conference.

Using this data

  • Download the underlying data as a compressed ZIP file

  • View or create your own tables

    View tables that we have built for you, or create your own tables from open data using our table tool